Miscellaneous Images
These images have an abstract appeal (in the view of the editor) that is independent of their relationship to this construction project.
Click here for an explanation of Image Source (column IS)
| Thumbnail | IS | Date | Location | Description |
|---|---|---|---|---|
![]() 800 , 1200 |
DN | Taken at 7:51:02 PM Friday, January 04, 2008 | Fourth Floor, Shaw Lane Parking structure, Michigan State University, East Lansing, MI | Night views of the Chemistry Building Complex. For these images, all of the lights in the outer rooms of the Annex were turned on. Since the Annex was designed to be energy conservative, the lights in all of the rooms are controlled by detectors that sense whether there is any occupants. To have the light on long enough to take these images, we had to have one person on each floor that ran around entering each room to trigger the detectors. Less there be a hue and cry about wasting energy for the sake of art, the whole process, and hence the interval the lights were on, only lasted 20 minutes. |
![]() 800 , 1200 |
N | Taken at 5:05:22 PM Wednesday, August 08, 2007 | Construction site, Chemistry Building, Michigan State University, East Lansing, MI | Fire suppresion system Standpipe with temporary Christmas tree of valves. |
![]() 800 , 1200 |
DN | Taken at 3:07:44 PM Thursday, April 24, 2008 | Chemistry Building, Michigan State University, East Lansing, MI | Looking up the glass panel facade at the west end of the Annex. The glass panels are at the ends of the Annex hallways and are at the junction of the Annex and the original building. |
![]() 800 , 1200 |
N | Taken at 5:06:06 PM Wednesday, August 08, 2007 | Construction site, Chemistry Building, Michigan State University, East Lansing, MI | Heating coils for the heated sidewalk are layed out prior to pouring the sidewalk. |
![]() 800 , 1200 |
N | Taken at 1:38:57 PM Wednesday, September 06, 2006 | Construction site, Chemistry Building, Michigan State University, East Lansing, MI | Sample of brick to be used in the facade of the annes. |
![]() 800 , 1200 |
DN | Taken at 3:06:50 PM Thursday, April 24, 2008 | Chemistry Building, Michigan State University, East Lansing, MI | Fire suppression system standpipe in front of the west end of the Annex. |
![]() 800 , 1200 |
N | Taken at 1:39:38 PM Wednesday, September 06, 2006 | Construction site, Chemistry Building, Michigan State University, East Lansing, MI | The sample of new brick for the facade of the annex viewed with the facade of the original building. |
![]() 800 , 1200 |
N | Taken at 7:38:22 AM Tuesday, October 24, 2006 | Fourth Floor, Shaw Lane Parking structure, Michigan State University, East Lansing, MI | Early morning view of the site. |
![]() 800 , 1200 |
N | Taken at 7:38:38 AM Tuesday, October 24, 2006 | Fourth Floor, Shaw Lane Parking structure, Michigan State University, East Lansing, MI | Early morning view of the site. |
![]() 800 , 1200 |
N | Taken at 7:43:52 AM Tuesday, October 24, 2006 | Room 120, Chemistry Building, Michigan State University, East Lansing, MI | Early morning view of building the forms for the west stairwell. |
![]() 800 , 1200 |
N | Taken at 11:40:49 AM Monday, December 04, 2006 | Room 120, Chemistry Building, Michigan State University, East Lansing, MI | Construction Class visiting the site |
![]() 800 , 1200 |
N | Taken at 11:42:46 AM Monday, December 04, 2006 | Room 120, Chemistry Building, Michigan State University, East Lansing, MI | Construction Class visiting the site |
![]() 800 , 1200 |
N | Taken at 11:43:16 AM Monday, December 04, 2006 | Room 120, Chemistry Building, Michigan State University, East Lansing, MI | Icicles on the retaining wall. |
![]() 800 , 1200 |
D | Taken at 7:19:48 AM Tuesday, December 19, 2006 | Fourth Floor, Shaw Lane Parking structure, Michigan State University, East Lansing, MI | The workday is about to begin. |
![]() 800 , 1200 |
D | Taken at 7:20:48 AM Tuesday, December 19, 2006 | Fourth Floor, Shaw Lane Parking structure, Michigan State University, East Lansing, MI | View of the illuminated construction site. Piles of sandy backfill material line the site in front of the annex. The second floor is ready to be poured. |
![]() 800 , 1200 |
D | Taken at 7:21:37 AM Tuesday, December 19, 2006 | Fourth Floor, Shaw Lane Parking structure, Michigan State University, East Lansing, MI | Dawn over the National Superconducting Cyclotron Laboratory. |
![]() 800 , 1200 |
D | Taken at 7:24:11 AM Tuesday, December 19, 2006 | Fourth Floor, Shaw Lane Parking structure, Michigan State University, East Lansing, MI | View of the illuminated construction site. Piles of sandy backfill material line the site in front of the annex. The second floor is ready to be poured. |
![]() 800 , 1200 |
D | Taken at 7:16:15 PM Friday, December 29, 2006 | CATA Bus Staging Area, Shaw Lane Parking Structure, Michigan State University, East Lansing, MI | View of the illuminated construction site. Two buses are visible in the foreground. The forms for the third floor are under construction. |
![]() 800 , 1200 |
D | Taken at 7:25:46 PM Friday, December 29, 2006 | Fourth Floor, Shaw Lane Parking structure, Michigan State University, East Lansing, MI | View of the illuminated construction site. The forms for the third floor are under construction. |
![]() 800 , 1200 |
D | Taken at 7:26:51 PM Friday, December 29, 2006 | Fourth Floor, Shaw Lane Parking structure, Michigan State University, East Lansing, MI | View of the illuminated construction site. The forms for the third floor are under construction. |
![]() 800 , 1200 |
D | Taken at 7:28:45 PM Friday, December 29, 2006 | Fourth Floor, Shaw Lane Parking structure, Michigan State University, East Lansing, MI | View of the illuminated construction site. The forms for the third floor are under construction. |
![]() 800 , 1200 |
D | Taken at 7:29:59 PM Friday, December 29, 2006 | Fourth Floor, Shaw Lane Parking structure, Michigan State University, East Lansing, MI | View of the illuminated construction site. The forms for the third floor are under construction. |
![]() 800 , 1200 |
N | Taken at 2:00:46 PM Friday, December 29, 2006 | Construction Site, Chemistry Building Annex, Michigan State University, East Lansing, MI | Bundles of spacers laying in the staging area. These spacers are used to maintain the separation between the rebar and the forms. |
![]() 800 , 1200 |
N | Taken at 1:42:26 PM Monday, January 22, 2007 | Fourth Floor, Shaw Lane Parking structure, Michigan State University, East Lansing, MI | Worker carrying fuel to for the generator of the termporary lights. |
![]() 800 , 1200 |
N | Taken at 2:42:34 PM Thursday, February 01, 2007 | Fourth Floor, Shaw Lane Parking structure, Michigan State University, East Lansing, MI | A snowy construction site. |
![]() 800 , 1200 |
N | Taken at 8:53:56 AM Friday, February 02, 2007 | South Shaw Lane, Michigan State University, East Lansing, MI | Notice the steam rising from the concrete truck. |
![]() 800 , 1200 |
N | Taken at 1:25:53 PM Friday, February 02, 2007 | Roof, Chemistry Building, Michigan State University, East Lansing, MI | The temporary lighting system on the roof of the original building. |
![]() 800 , 1200 |
N | Taken at 3:39:57 PM Friday, February 02, 2007 | Roof, Chemistry Building, Michigan State University, East Lansing, MI | The temporary lighting system on the roof of the original building. |
![]() 800 , 1200 |
N | Taken at 3:42:10 PM Friday, February 02, 2007 | Roof, Chemistry Building, Michigan State University, East Lansing, MI | Looking E at the exhaust stacks. |
![]() 800 , 1200 |
N | Taken at 10:40:49 AM Friday, February 09, 2007 | Roof, Chemistry Building, Michigan State University, East Lansing, MI | The concrete bucket is being returned to the ground for another load of concrete. |
![]() 800 , 1200 |
N | Taken at 10:41:03 AM Friday, February 09, 2007 | Roof, Chemistry Building, Michigan State University, East Lansing, MI | The concrete bucket is being returned to the ground for another load of concrete. |
![]() 800 , 1200 |
N | Taken at 10:41:15 AM Friday, February 09, 2007 | Roof, Chemistry Building, Michigan State University, East Lansing, MI | The boom of the crane with a jet contrail in the background. |
![]() 800 , 1200 |
N | Taken at 3:13:28 PM Wednesday, March 07, 2007 | Basement, Chemistry Building Annex, Michigan State University, East Lansing | Plumbing for west restroom. |
![]() 800 , 1200 |
N | Taken at 3:17:31 PM Wednesday, March 07, 2007 | Basement, Chemistry Building Annex, Michigan State University, East Lansing | Colorful plumbing for the east restroom |
![]() 800 , 1200 |
N | Taken at 3:27:54 PM Thursday, March 22, 2007 | Roof, Chemistry Building, Michigan State University, East Lansing | Top of the boom of the crane with contrail. |





































